Another week gone and still no massive steps forward. I am trying to make sure that I manage to get the finish right on the surface of both the BAC 1-11 and the BAE 146. Saying that, there is still a saddle tank to be made on the 146 so the smooth finish may end up out the proverbial window

I could though make the build of the development aircraft that didn't have the saddle tank and was not carrier capable which would get around having to do some of the work.
Ideas for other projects keep cropping up. Late 30's, early 40's bomber being one of them along with a comment made in another thread by someone about a T2V-1 which creates yet another build. The kit bash for the second one may have to involve a new step for me as I may have to scratch build the undercarriage, I hope not though.
Back with the BAC 1-11, the method of attaching the radome to the underside of the fuselage has been resolved as is the method of displaying the aircraft although the metal rod I am using may need to be replaced as I am not sure it will be up to the job.
Gondor