avatar_nönöbär

Graf Zeppelin, 1/200, long time project

Started by nönöbär, June 22, 2025, 02:00:38 AM

Previous topic - Next topic

nönöbär

Step 60/140 – HULL COMLETE!

After sixty weeks of total building time the hull is finally completed. The last montes were quite boring with all the hull parts, but now its done.
130cm and 4,8kg of metal parts now form the hull of the Graf Zeppelin.
Lets hope some more intersting contruction steps will now ahead.

Step 60 parts:


Step 60 completed





Scratch Bears Model Page: www.scratchbaer.de

Old Wombat

Hopefully there's something to fill the spaces behind those gaps!  ;)
Has a life outside of What-If & wishes it would stop interfering!

"The purpose of all War is Peace" - St. Augustine

veritas ad mortus veritas est

PR19_Kit

Hmm, that's probably large enough to motorise and add radio control.

Maybe they'll sell an 'Upgrade kit' after it's all been sent out to the subscribers?
Kit's Rule 1 ) Any aircraft can be improved by fitting longer wings, and/or a longer fuselage
Kit's Rule 2) The backstory can always be changed to suit the model

...and I'm not a closeted 'Take That' fan, I'm a REAL fan! :)

Regards
Kit